Our Projects

Solar panels of a solar farm with hills in the background

Gunnedah Solar Farm Construction

Year: 2020/21

Origin: Port Botany NSW

Destination: Gunnedah NSW

Receival of 700 40ft containers at Port Botany, unpacking and delivery to the solar farm site in Gunnedah, west of Tamworth in rural NSW. For this 4-month project, we are utilising Singles and B-Doubles. 

B-double tautliner with open curtains revealing the timber load

South East (SA) Timber Transport 

Year: 2020/21 ongoing

Origin: Mount Gambier area SA

Destination: Adelaide SA & Melbourne VIC

S&S Freight Services provides regular linehaul services of processed timber products, from timber mills in the South East region of South Australia to Adelaide and Melbourne.

Craigieburn Road Upgrade

Year: 2020/21 ongoing

Origin: Adelaide SA

Destination: Melbourne VIC

Delivery of 600 loads of road surface and tunnelling components, jacking pipe and recycled water.

Truck loaded with concrete railway sleepers leaving a yard

WA Concrete Railway Sleeper deliveries

Year: 2020/21

Origin: Geelong Region VIC

Destination: Pilbara Region WA

Delivery of 30,000+ concrete railway sleepers over a period of 8 months, using a combination of trailer configurations including singles and road trains.

Large concrete panels installed at the Bell Street construction site

Bell Street Overpass

Year: 2020

Origin: Melbourne VIC

Destination: Melbourne VIC

For this construction project, BT staged cement panels in our local holding yard and delivered them to our customer’s site as needed.  

Iron Bridge Mining Camp Construction

Year: 2020

Origins: SA, WA & QLD

Destination: Iron Bridge / Pilbara WA

70+ out-of-gauge and road train loads delivered to the mine camp constructed at Fortescue Metals Group’s Iron Bridge site.

Truck loaded with long pipes

Roxby Downs & BHP Olympic Dam Expansion

Year: 2020

Origins: QLD, WA, SA

Destination: Roxby Downs SA

Delivery of 36 out-of-gauge loads from Queensland, and 42 out-of-gauge loads of 20m pipe delivered from Western Australia to BHP’s Roxby Downs Mine.

Truck with building on trailer

Pilbara Mining Camp Construction

Year: 2020

Origins: Perth WA, various locations in QLD & Millicent SA

Destination: Mining site in the Pilbara WA

Transport of oversized accommodation units from various locations in Queensland, South East SA and Perth to the mine site in the remote north of Western Australia.

110+ out-of-gauge and road train loads over a period of 4 weeks. 

Corowa Solar Farm Construction

Year: 2020

Origins: Geelong VIC

Destination: Corowa NSW

Provision of off-wharf services at Geelong, as well as container destuffing of inverters, and delivery to the solar farm site near the town of Corowa, located on the Murray River and Victorian border between Albury and Yarrawonga.

truck with oversized machinery on trailer

Mindarie Mine Relocation

Year: 2019

Origins: Mindarie SA

Destination: Boonanarring WA

Relocation of mining equipment, making up 110+ out-of-gauge loads from Mindarie in eastern SA to Boonanarring, just north of Perth – nearly 3,000km away.

Large construction machine loaded onto a trailer

Carrapateena Mine Construction and Expansion

Year: 2018/19

Origins: Various locations nationally

Destination: Pernatty SA

Transportation of structural steel, and in-gauge and out-of-gauge freight from national suppliers to Oz Minerals’ Carrapateeena Mine site.

Consolidation and delivery of mine site equipment; and 150 loads picked up off-wharf from Queensland, NSW and SA and delivered to site.

Antonov AN124 Project

Year: 2018 

Origins: Adelaide SA

Destination: Edinburgh SA

In-gauge and out-of-gauge, over-dimensional transport of P-8 Poseidon simulator and training components for delivery to the RAAF Base in Edinburgh, including up to 5.4m high loads.